Large-load partner for municipal & public power utilities

Power for large loads, without waiting years for the grid.

Interconnection and grid-access advisory for utilities, data centers, and energy-intensive sites. We help customers plan with the grid instead of around it — across the United States and Europe.

Request a call

In brief

Career figures, not a development pipeline. Project cards are on the Track Record page.

20 years

Working alongside utilities in Europe and the United States.

60+ projects

Solar projects worked on internationally, from a start in Germany.

250+ MW

Combined capacity of that body of work.

$200,000+

Avoided on one interconnection by reusing existing switchgear and a transformer.

The problem

Large-load requests are arriving faster than distribution and substation capacity can be built. When customers engage late, the options narrow.

Customers arrive with finished designs

By the time a large-load request reaches the utility, the site, load profile and schedule are often fixed, leaving little room to adapt.

On-site gas becomes the default

Facing long timelines and costly upgrades, customers may turn to on-site natural gas generation, a decision that is hard to reverse.

Studies assume the worst case

Loads are typically studied at full peak demand, triggering substation upgrades and reconductoring that may not be needed.

How we help

An independent advisor at the utility's side, speaking the language of interconnection studies and project economics.

A customer-ready options packet

A clear guide your account managers can hand to large-load customers on day one, covering solar, storage, thermal storage, flexible load and microgrid-ready designs.

Self-supply that shrinks the request

We show how on-site supply and flexibility reduce the grid capacity a customer actually needs to request in the large-load study.

Siting to existing hosting capacity

Projects sized to available distribution hosting capacity can avoid substation upgrades and reconductoring, saving time and cost for everyone.

On the feeder

Solar and storage sited at the feeder, full-feeder and partial-feeder microgrid-ready designs, and phased energization so load can start before a full upgrade.

How it works

1

Early conversation

Engage the customer at the concept stage, alongside the utility's existing design assistance. Bring interconnection advice in before the design is frozen.

2

Options & sizing

Match behind-the-meter options to the load profile, site and available hosting capacity.

3

Study-ready request

Define the net grid request, the tariff path and the bill impact for each scenario.

4

Partners for the stamp

Stamped engineering and construction stay with appropriately licensed partners. We stay on as the advisor through interconnection and energization.

Have large-load customers in the queue?

Let's talk about reaching them before their designs are locked in.

Request a call