Large loads & data centers
Bring your own supply. Ask the grid for less.
Data centers and industrial loads can connect faster when on-site solar, storage and flexibility reduce the capacity they need from the grid.
Talk about your projectThe behind-the-meter menu
Options to evaluate before defaulting to on-site natural gas.
Solar
On-site or adjacent generation sized to the site and to available hosting capacity.
Battery storage
Shave peaks, firm solar and support phased energization.
Thermal & ice storage
Shift cooling load out of peak hours.
Flexible load management
Data-center workloads that can flex during grid peaks reduce the firm capacity required.
Containerized solar + storage
Pre-engineered, modular units that deploy quickly and scale with the load.
Microgrid-ready designs
Designed for backup and islanding from the start, with room to grow.
Peak versus average
Studied at peak, operated below it
Data center facilities are often studied at their full peak demand, while average utilization runs well below that peak. Flexible load and on-site storage can raise utilization of the grid capacity that is built, and reduce what needs to be requested in the first place.
Containerized compute, paired with solar and storage
We are developing a containerized solar-plus-storage product with a 1 MW IT containerized compute option, expected in the second half of 2027.
Data centers paired with solar and storage
Modular capacity that can be sited where distribution hosting capacity already exists.
Start early. Size it right.
A short call is enough to see whether behind-the-meter options fit your large-load pipeline.
Request a call